22.86 MWp
Riau Andalan
Pulp & Paper · Grid-tied ground-mounted PV
- Location
- Riau
- Sector
- Pulp and paper
- TSE scope
- Electrical, mechanical & balance-of-system (BOS) installation
- Pre-commissioning, testing & commissioning support
25.7 MWp across 3 grid-tied PV projects, rooftop and ground-mounted.
22.86 MWp
Pulp & Paper · Grid-tied ground-mounted PV
1,793.76 kWp
Sidoarjo · Grid-tied rooftop PV
1,047.2 kWp
Mojokerto Expansion · Grid-tied rooftop PV
Take them together as a full EPC package, or stage by stage as your team needs.
Capacity, layout and project economics are settled before any material is bought.
Material from vetted vendors, quality-checked before it reaches site.
Field work under QA/QC and HSE control, through to handover documents.
Keeping energy output at design level once the system is running.
Battery storage, hybrid systems, and upgrades to existing PV plants.